Elering Ltd. submitted an application on 01.12.2025 to initiate the Nordic-Baltic hydrogen infrastructure National Designated Spatial Plan (NSP) and strategic environmental impact assessment.

The state electricity and gas system operator Elering Ltd. (hereinafter Elering) is developing external connections with neighbouring countries in accordance with the owner's expectations and is making preparations to create a hydrogen transmission network and to perform the functions of a hydrogen system operator. To achieve this goal, Elering, together with its partners, is planning an international infrastructure project, the Nordic–Baltic Hydrogen Corridor (NBHC), through which a hydrogen transmission network will be created between Finland, Estonia, Latvia, Lithuania, Poland and Germany. The preparation of a NSP for the Nordic–Baltic hydrogen infrastructure is necessary for the implementation of the project and the planning of hydrogen infrastructure in Estonia. A new hydrogen transmission pipeline through Estonian land must be planned from the coast of Northern Estonia, where the submarine pipeline from Finland ends, to the Latvian border. The route of the submarine pipeline between Estonia and Finland will be selected with a separate building permit from the plan. The hydrogen pipeline is intended to be placed as much as possible within the corridors of the existing (energy) infrastructure in order to reduce land occupation.

The Nordic-Baltic Hydrogen Corridor is a strategic opportunity for Estonia to participate in the future energy system of Europe, strengthening energy security and economic position.

Pursuant to Section 28(4) of the Planning Act, it was possible to submit an application of the same nature until 10.01.2026. No applications were submitted by the deadline.

All interested parties can participate in the planning process; the Ministry of Economic Affairs and Communications will provide more detailed information after the planning process is initiated.

Contact

Project manager

Monika Korolkov
[email protected]
+372 5884 7055

Media contact

Geili Heinmaa
[email protected]
+372 5850 3951

Last updated: 17.03.2026

open graph imagesearch block image

Was this page helpful??